Background The Erin Wastewater System Sewage Pumping Station (SPS) project was developed as part of the Town of Erin’s new wastewater collection system, extending municipal wastewater services to the communities of Hillsburgh and Erin Village. The project involved the construction of…
Regional Municipality of Niagara – Line 2 Sewage Pumping Station Upgrade
Background The Line 2 Sewage Pumping Station Upgrade was undertaken by the Regional Municipality of Niagara to improve the reliability, capacity, and operational performance of an existing municipal sewage pumping station. The project included upgrades to the wet well and valve…
City of Hamilton – Garner Road (HD018) Water Pumping Station Upgrades
Background The Garner Road (HD018) Water Pumping Station Upgrades project was undertaken by the City of Hamilton to increase the capacity, reliability, and operational efficiency of an existing municipal water pumping station. The upgrade included the replacement of aging pumping equipment,…
Duffin Creek Water Pollution Control Plant – Digester Complex Upgrades and Refurbishments
Background The Digester Complex Upgrades and Refurbishments Project at the Duffin Creek Water Pollution Control Plant (WPCP) was undertaken to modernize critical sludge treatment infrastructure and improve long-term operational performance. The project included the replacement and upgrade of equipment within the…
City of Toronto – Ashbridges Bay Treatment Plant (WAS Thickening & South Substation Upgrades)
Background The Ashbridges Bay Treatment Plant – Waste Activated Sludge (WAS) Thickening and South Substation Upgrades project was undertaken to modernize one of the City of Toronto’s major wastewater treatment facilities. The project involved replacing the existing Dissolved Air Flotation (DAF)…
Township of Springwater – Doran Neighborhood Water Treatment Plant & Sewage Pumping Station
Background The Doran Neighborhood Water Treatment Plant (WTP) and Sewage Pumping Station (SPS) project was developed to expand the Township of Springwater’s municipal water and wastewater infrastructure. The project involved the construction of a new water treatment facility alongside a new…
Town of Erin – Water Resource Recovery Facility
Background The Town of Erin Water Resource Recovery Facility (WRRF) project involved the construction of a new municipal wastewater treatment plant designed to support the community’s growing infrastructure needs. The project included the development of the complete treatment facility, together with…
St. Rose Storm Water Pumping Station
Background The St. Rose Storm Water Pumping Station project involved the construction of a new municipal stormwater pumping station, including all associated site works, structural components, process equipment, mechanical systems, HVAC, plumbing, electrical infrastructure, instrumentation, and industrial automation systems. The project…
Lisgar District FDC Pumping Station & De-watering
Background The City of Mississauga undertook the construction of the Lisgar District Utility Trench De-Watering and Foundation Drain Collector (FDC) Pumping Station to support utility trench de-watering and improve groundwater management. The project included the construction of the FDC pumping station,…
Region of Halton – Premier Gateway Employment Area Water & Wastewater Servicing
Background As part of the Region of Halton’s expanding municipal infrastructure, the Premier Gateway Employment Area Water & Wastewater Servicing Project involved the planning, detailed design, and implementation of a new Type IV municipal pumping station. Designed with a four-pump dry…